Header image  
PLACER COUNTY, CALIFORNIA
 
  
 
NID


   
 Lincoln



 
 

Documents


Raw Water Storage and Pipeline Reports (published January 2010)
pdf Raw Water Storage Facility Siting Study (4.0 MB)
pdf Raw and Treated Water Pipelines Corridor Evaluation, part 1 (text only, 1.5 MB)
pdf Raw and Treated Water Pipelines Corridor Evaluation, part 2 (figures, 3.8 MB)
pdf Raw and Treated Water Pipelines Corridor Evaluation, part 3 (appendices, 186 kb)

Technical Memorandum and Reports (published Oct./Nov. 2009)
pdf Water Treatment Plant Siting Study (3.5 MB)
pdf Water Quality Evaluation (3.8 MB)
pdf Environmental Constraints Analysis (3.8 MB)
pdf Treated Water Hydraulic Control/Metering Station
(1.8 MB)
pdf Pre-design Geotechnical Report: Walker Water Treatment Plant (part one, 2.23 MB)
pdf Pre-design Geotechnical Report: Walker Water Treatment Plant
(part two, 463 KB)
pdf Pre-design Geotechnical Report: Walker Water Treatment Plant (part three, 2.5 MB)
pdf Pre-design Geotechnical Report: Pipeline and Whisky Run Tunnel
(part one, 5.4 MB)
pdf Pre-design Geotechnical Report: Pipeline and Whisky Run Tunnel (part two, 1.8 MB)
pdf Pre-design Geotechnical Report: Pipeline and Whisky Run Tunnel (part three, 1.2 MB)
pdf Pre-design Geotechnical Report: Pipeline and Whisky Run Tunnel (part four, 2.3 MB)
pdf Pre-design Geotechnical Report: Big Hill and Whisky Run Reservoir
(part one, 2.8 MB)

April 23, 2009 Public Meeting
pdf
Presentation from the April 23, 2009 public meeting (3 slides/page, 1 MB file)
pdf Presentation from the April 23, 2009 public meeting (large file, 3.5 MB)
Meeting Agenda (Word document)
pdf Display board 01 - Map of Proposed Project Area (636 KB)
pdf Display board 02 - Pipeline Corridor (388 KB)
pdf Display board 03 - Flow Diagram (196 KB)
pdf Display board 04 - Pre-design Environmental Considerations (612 KB)
pdf Display board 05 - CEQA Process (427 KB)

NOTES: Printouts of the presentation and display boards may be ordered from Kinkos in Auburn (530-887-8800). Refer to the NID 4/24/09 files.

Hard copies of the above files are also stored in the "government" section at the Lincoln and Nevada County public libraries, at the NID office and at the City of Lincoln.

Lincoln MAC Meeting on March 16, 2009
pdf
Presentation to the Lincoln MAC (2.2 MB)

NID Board of Directors Meeting on March 11, 2009
pdf Presentation to the Board of Directors
(1.2 MB)

NID Board of Directors Meeting on May 28, 2008
pdf Presentation to the Board of Directors (PowerPoint slides only)
pdf Presentation to the Board of Directors
(PowerPoint Show 5mb file)

Background Information:
pdf Project Fast Facts
3-25-08
pdf Project Frequently Asked Questions
3-25-08

Media and News Releases:
pdf News Release - March 20, 2009: Public Meeting about the Proposed Regional Water Supply Project to be Held on April 23, 2009
pdf News Article - March 13, 2008: Lincoln News Messenger: Nevada Irrigation District Updates Public on Water Project
pdf News Article - February 6, 2008: The Grass Valley Union: Lincoln Water Proposal Subject of Meetings
pdf News Release - February 4, 2008: Public Meeting to Introduce Proposed Regional Water Supply Project

Meeting Presentation (Note: If you have trouble viewing, right click and choose "Save Target As" to copy the file to your computer.)
pdf Presentation from February 26 and March 4, 2008 Public Meetings (6MB file)
pdf Presentation from February 26 and March 4, 2008 Public Meetings (2-slides/page)

NID Site Study Completed in August 2005: http://www.nidwater.com/documents/projects/Lincoln_NID_Site_Study_August_2005.pdf

Technical Memoranda:
pdf
Land Use and Water Demand Memorandum: The “Land Use and Water Demand Memorandum” includes an evaluation of existing land use designations within the potential service area of the proposed NID Regional Water Treatment Plant and provides an estimation of the projected water demands within the potential service area. Determination of water demands is necessary to size the various facilities for the proposed water supply.(posted 10/13/08)

Administrative Documents:
pdf MOU for the Joint Development of Water Resources

pdf MOU and Conceptual Framework for the Development of Treated Water Facility
pdf Water Facility/Planning Phase Agreement
pdf Planning and Site Evaluation Agreement
pdf Drought Contingency Plan 6/27/07

Link to Right of Entry Page

Link to NID Documents Page
http://www.nidwater.com/documents.cfm

 

 

RSS FeedRight click this icon and copy to your RSS Reader
What is RSS? Click here: RSS

Report broken links to info@nidregionalwtp.org

 

 

 

 

 

 
Home | NID Link | Lincoln Link | Contact